Categories
Civil construction inspection checklist

Civil construction inspection checklist

Geology 2. Soil Engineering 3. Earthwork and Heavy Equipment 5. Rock Excavation 6. Water and Sitework 7. Trench Protection 8. Underground Piping 9. Underground Utilities Curb and Sidewalk Paving How will site be staked for excavation?

What is the sequence of excavation and what and how much equipment will be required? What are contingency plans for rain, snow, cold, heat? Responsibility for following items:?

22+ Sample Construction Report Templates – Word, Docs, Pages

Hauling borrow c. Trenching e. Backfilling trenching f. Hauling excavation spoils g. Unsuitable material for backfilling h. Site re-grading for access i. Crushed stone for site re-grading for access j. Is the excavation classified or non-classified? What equipment will be used for ripping?

Flowsheets in epic

What levels of production will be anticipated? What type of drill and bit will be used?

Create custom edid

What are the alternatives? Is blaster licensed? Are permits obtained? How is the rock to excavate? Hold in a slope? Drain water? Soil Engineering Are geological, topographical, water and soil maps available for the site? What type of soil is on the site?The following checklist should be used as a guide for better quality control over earth excavation. Dewatering equipment may be necessary, and disposal for unsuitable material must be provided.

If differences are noted, consult your supervisor for determination of action to be taken. Record daily load count for various classifications of excavation when required for partial payments. Fill is not permitted beneath footing to correct over excavation. Geotechnical-Material Engineer. To know more about me just visit AboutMe. Your email address will not be published. Notify me of follow-up comments via e-mail address.

Save my name, email, and website in this browser for the next time I comment. Notify me of follow-up comments by email. Notify me of new posts by email. Earth Excavation Checklist excavation checklist The following checklist should be used as a guide for better quality control over earth excavation. Orderly removal of materials.

Satisfactory drainage. Do not modify or change established elevations without written approval of the Contracting Officer. Correct over-excavation by placing approved, compacted backfill or concrete fill, depending on location.

civil construction inspection checklist

Keep a detailed record of any such corrective work. Share this:. No Comments Feb 24, Add a Comment Cancel reply Your email address will not be published. Theme by MyThemeShop. Sorry, your blog cannot share posts by email.This results in inevitable version control issues, disparity in the information included, and in layout.

Using the Civil Pro ITPs, you record the information for your Inspection Test Plan in Civil Pro by specifying steps in the inspection and testing process, how each item is inspected, what records are kept, the Specification Reference and person responsible. For each test you can specify the conformance criteria, minimum number of tests required for each Lot and the frequency of testing. The screenshot below shows the test requirements for the backfill material. Individual lines can be excluded from either the Checklist or ITP with a single click.

When you need a Checklist for a Lot, simply select the template from the Specification Register and a copy is made and attached to the Lot. It can either be used as is, or customised without affecting the original template. Users can then print a hard copy to be completed manually in the field refer to the below screenshotor complete the Checklist electronically using the Civil Pro Mobile app.

The sign-offs for the Checklist are defined by shaded and unshaded boxed as defined in the Checklist View.See more: earthwork inspection checklistconstruction inspection checklistearthworks checklistchecklist earthworkinspection checklist constructionearthworks inspection checklistconstruction inspection formsearthwork checklistconstruction inspection checklist formchecklist earthworksearthwork inspection formsconstruction inspection table forminspection checklist earthworkearthwork construction checklistearthwork construction inspection checklistconstruction inspection checklist earthworkconstruction defects checklistearthworks inspectionconstruction checklistearthworks construction inspection forms.

Please see PM. Please check your PM box. Thank you. Thank you!! I have done something similar in malaysia. I am ready to give. Experienced field engineer.

civil construction inspection checklist

The email address is already associated with a Freelancer account. Enter your password below to link accounts:.

civil construction inspection checklist

I already have all the usual books! Skills: Civil EngineeringConstruction MonitoringProject Management See more: earthwork inspection checklistconstruction inspection checklistearthworks checklistchecklist earthworkinspection checklist constructionearthworks inspection checklistconstruction inspection formsearthwork checklistconstruction inspection checklist formchecklist earthworksearthwork inspection formsconstruction inspection table forminspection checklist earthworkearthwork construction checklistearthwork construction inspection checklistconstruction inspection checklist earthworkconstruction defects checklistearthworks inspectionconstruction checklistearthworks construction inspection forms About the Employer:.

Looking to make some money? Your email address. Apply for similar jobs.

Quality Control Plan For Contractor Template Download

Set your budget and timeframe. Outline your proposal. Get paid for your work. It's free to sign up and bid on jobs.

Bbc somali video

Awarded to:. Nilupa Please check your PM box. Link Accounts. I am a new user I am a returning user.

civil construction inspection checklist

Email address. Username Valid username. I am looking to Hire Work. Username or Email. Password I forgot my password.The following procedures have been found worthwhile, to enhance the probability of carrying out the intent of the designs and specifications on a large variety of projects.

This results in a completed facility that will properly ensure the purpose for which it is intended, at minimum maintenance cost. Geotechnical-Material Engineer.

Xsh cam settings

To know more about me just visit AboutMe. Your email address will not be published. Notify me of follow-up comments via e-mail address. Save my name, email, and website in this browser for the next time I comment. Notify me of follow-up comments by email. Notify me of new posts by email. Recommended Procedures for Concrete Inspection The following procedures have been found worthwhile, to enhance the probability of carrying out the intent of the designs and specifications on a large variety of projects.

The purpose of inspection is to assure that good practices are followed in constructing the project in accordance with the design and specifications and not to establish these practices. Any needed change in plans or specifications should be brought to the attention of the architect or engineer so that the designer will have an opportunity to make the final decisions in so far as the changes affect his design.

Inspection does not relieve the contractor of his responsibility to do the work properly in accordance with the contract documents. Inspection personnel should co-operate with the contractor, but must refrain from running the job for the contractor, as this is not part of the inspection function and may result in undesirable claims in case of later trouble. Since the architect or engineer has the final responsibility for inspection in this recommended practice, he should insist that the owner should give him the authority to go with this responsibility.

Fujifilm 33mm 1

He should then plan inspection commensurate with the character, magnitude and importance of the job, and advice the owner of the approximate cost necessary to execute the inspection properly. Proper inspection provides for continual inspection during the placing of concrete and its finishing, and includes preparations prior to the start of concreting such as proper formwork, placing or reinforcing etc, as well as proper protection and curing of the finished concrete.

The architect or engineer should see to it that qualified and dedicated inspectors are on the job, as this is vital to effective inspection. Where such inspectors are not available or where there are special requirements in the designs and specifications, training should be carried out to qualify such inspectors.

A meeting between the architect or engineer, the contractor, and the inspection personnel just before construction is started is a must. At such a meeting questions can be answered and procedures reviewed, so that everyone knows ahead of time what is expected and how it is to be carried out.The first step of building construction is earthwork.

Earthwork begins with the soil investigation even before preparing the plan of a building. Then earth filling or cutting is done to make the ground surface even. And then, the land is cleaned. Cleaning involves removing tree roots, existing sub-structure if any and any small plant or vegetation from the site.

Finally, plot is secured by making fence all around it. This checklist is for the earth work after construction begins.

QUALITY CONTROL CHECKLIST FOR EXCAVATION WORK

This checklist is very important as our complete building will stand on this earth. Services connection : Before starting earthwork make sure there are no services line such as electrical connection, water supply and drainage connection, telephone line etc. Benchmark : Mark your desired level in a permanent place.

Side-slope in excavation : During earth excavation check that slope is maintained in side-soil. You may consult geotechnical engineer that the base soil is perfect for further work execution.

Excavation area : Check the excavation area is extended beyond the foundation of building for easy moving during work execution. Cleanign of foundation bed: Check that loose and displaced materials are cleaned from the foundation bed. Backfill : Check backfill is being done after ending the shutter removal period of footing. Backfilling material: Try to backfill with the excavated soil. And check the backfilling material is free from large lumps, organic or any other foreign materials.

checklist for beam and slab before staring concrete

Check all shuttering materials are removed before backfilling. Check backfilling process : Backfilling should be done evenly on all sides. Check that is being done properly. Backfill compaction : Backfilling should be done layer by layer. And each layer should be compacted to maximum dry density of soil.

Check those are being done properly. Recent Updates. Building Construction Checklist Earthwork. Copyright Design by Online Civil.As I am growing older I started to realize how tough it is to keep my body in shape and I was beginning to feel like I was permanently bloated. The TeaTox was so easy, I did not have to change my diet to see results. After two weeks, working out about 3 times a week, I finally have a flat stomach again.

I would highly recommend this Teatox. Shall continue with the next packet. Qing GuoAfter 14 days wif SkinnyMint Teatox, my pants are much looser now. Flatter and firmer tummy. But still a long way to reach my target. JillianFirst of all, I would like to thank you so much for coming up with this really amazing product. I feel so great and energized after consuming this product. My complexion has also improved a lot and my skin is glowing prettily.

I'll definitely recommend this product to all my families and friends. This is a product that I will never let go of.

I'll be back for my next Teatox in 6 weeks time. Chloe JonesMy 28 day teatox, I'm feeling so good, no bloating. I'm full of energy. And again I stress that I haven't changed my diet or exercise programme and these are the results. So I always looking forward the alternate night drinking the Night Cleanse which have ginger spice scented.

I find it soothes and calm my nerve down after a long day at work. Ive been eating happily and do exercise twice a week but the result still amazing. Surprisingly it does cut off my urge for having supper too. Well, I didn't regret it as it did help cure my constipation and bloating issues. During the progress I didn't watch my diet or exercise so I'm quite surprised with the results.

Wellllllll here's the before and after. Kinda embarrassing bc I didn't realize how much larger I was before.